For Builders

Builder Specifications

Detailed technical data for construction and development at Lago Bello.

Infrastructure & Utilities

  • Electrical: Fully buried electrical design (Brownsville PUB).
  • Water/Sewer: Municipal water and waste water infrastructure installed.
  • Drainage: Storm drainage infrastructure and retention wall on Lake boundary complete.
  • Streets: 28-foot wide paved streets.

Lot Specifications

  • Zoning: Residential Single Family.
  • Setbacks: Standard city setbacks apply (refer to plat map).
  • Soil Conditions: Geotechnical reports available upon request.

Desirable Flood Zone Status

  • Lower Risk: Located in Zones X and X (Shaded)β€”a distinct upgrade over typical Brownsville flood plains.
  • Lower Costs: No federal mandate for flood insurance, potentially saving you thousands.
  • Secure Investment: Buy where the water is less likely to go.

(Current as of 2025. Maps subject to change.)

Construction Guidelines

  • Architectural Control: All plans must be approved by the Architectural Control Committee (ACC).
  • Minimum Square Footage:
    • Homes adjoining the Common Area Lake must contain a minimum of 2,000 sq ft of living area.
    • All other homes must contain a minimum of 1,800 sq ft of living area.

Site Photos

Share on: